• denmark WA
  • Mt Barker
  • warren district
        project
  • about us
  • links
  • CWF history
  • on the coast
  • global warming
  • Wind WA
  • contact
  • 7 Samson St
    Fremantle WA 6160
    ph/fax 08 9430 7371

    ABN 46 008 799 077

    Webmaster



    free hit counter



    harvesting energy from wind & sun

    Mt Barker Community Windfarm;

    5/8/2008 Mt Barker Windfarm gets certified capacity for 2010/2011 by the IMO. Some 2000MW of wind plant was submitted, but only Mt Barker gets certification!

    4/8/2008 All three turbine locations are pegged by Denmark Surveying and Mapping.

    11/07/2008 Huge winds reset records at the top of Mt Barker Hill for monitoring sensors. On Friday morning at 7:30am, the top anememeter, 46m above the ground, recorded a 10 minute average windspeed of 30.8 m/s compared the previous maximum two years ago of 25.8 m/s. At the same time, the highest 2 second gust was also recorded and at 41.3m/s (149km/hr) is much higher compared to the previous record of 35.7 m/s. While the wind turbines would have shut down at these windspeeds, they are still well below survival speed.

    Last modified 31-10-08 © Copyright 2004-2008 SkyFarming Pty Ltd