Turbine 1 install continues, 11/12/2012

The arrival of the stator hub, the heaviest part of the nacelle.

Unloading the stator, note the very dark skies. Unusually wet for this time of year.

The top section of the tower. This is the longest component.

The site is becoming increasingly crowded.

Unloading the top tower section.

The heaviest and widest of the tower sections, the bottom, appears just through the valley entrance.

And on the way to turbine 1 site.

All three tower sections have now been safely delivered to site.

A bit of cleaning is required . . .

The switchroom, with an obvious spot for a signboard.