Turbine components and the cranes turn up, 10/12/2012

The first turbine components turn up. This is the top half of the rear of the nacelle.

One of the big crane's support trucks going up the valley entrance.

The blade sets for turbine 1 arrives.

The smaller of the two cranes, LWB 80T in size, unloading the blades.

And putting it down and out of the way.

Back in the switchroom, the High Voltage switchgear is being installed.

Another support truck for the big crane.

The big crane, SWL 400T. The same cranes and crew as for Mt Barker.

Installing the transformer and the oil tray it sits in before the bottom tower section goes on.